Planned
N0r5ke Phase 2: Oslo-Trondheim terrestrial (planned)
🇳🇴 Oslo → 🇳🇴 Trondheim / Øysanden
Phase 2 (planned): ~700 km terrestrial fiber between Oslo and Trondheim as part of a ~2,500 km dark fiber ring project (schematic).
Planned terrestrial fiber segment between Oslo and Trondheim, completing the N0r5ke dark fiber ring.
Route
Endpoints: 🇳🇴 Oslo → 🇳🇴 Trondheim / Øysanden
Route is auto-generated for visualization from endpoints (schematic).
Owners & Operators
🇳🇴
N0r5ke Fibre
owner & operator
Infrastructure
Jurisdiction:
Norway
Networks
- N0r5ke Viking (owner, operator)
- N0r5ke Phase 2: Bergen-Oslo subsea (planned) (owner, operator)
- N0r5ke Phase 2: Oslo-Trondheim terrestrial (planned) (owner, operator)
- N0r5ke Viking (Molde-Andalsnes crosslink) (owner, operator)