N0r5ke Phase 2: Oslo-Trondheim terrestrial (planned)

Phase 2 (planned): ~700 km terrestrial fiber between Oslo and Trondheim as part of a ~2,500 km dark fiber ring project (schematic).

Planned terrestrial fiber segment between Oslo and Trondheim, completing the N0r5ke dark fiber ring.

Route

Endpoints: 🇳🇴 Oslo → 🇳🇴 Trondheim / Øysanden

Route is auto-generated for visualization from endpoints (schematic).

Owners & Operators

🇳🇴

N0r5ke Fibre

owner & operator Infrastructure
Jurisdiction: Norway